Customization: | Available |
---|---|
Power Source: | Electric |
Process: | Concentration and Dry |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | SLG65 | SLG70 | SLG85 | SLG95 |
Install Power |
65KW | 110KW | 190KW | 250KW |
Consumption Power |
42KW | 77KW | 133KW | 175KW |
Output | 120-150KG/H | 220-260KG/H | 500-600KG/H | 900-1000KG/H |
Dimension | 19000×1300×2200mm | 22000×1300×2200mm | 30000×1300×2500mm | 38000×1300×3000mm |
4.Flow chart:
Raw Materials Configuration→ Mixing→ Conveyance→ Extrusion→ Conveyance→ Drying→ (Screening→) Flavoring & Oil injection → Cooling
Voltage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries.
Machines Materials: All the machines are made by stainless steel at food grade, this line is with reasonable design and with high automation; the screws are made by alloy steel and with self-cleaning function
5.Machine photos in factory:
6.Jinan Saibainuo machinery company service:
1) Package & Shipment:Wooden case,shipped by sea.
2) Installation,debugging & Maintenance: Overseas Engineers
1.Manufacture | Keep the quality the first. |
Make more products benifit to customers' need. | |
2.Online/Sale service | Supper and solid quality. |
Fast and punctyal delivery | |
Standard export package or as customers' need. | |
3.After-sale service | Assistance to build factory or your project. |
Repairing and maintenance if any problem occur in the warranty. | |
Installation and clerks training. | |
Spare and wearing parts for free or with big discount. | |
Any feed back of machines can be told us, and we will try our best to support you. |
|
4.Other cooperate service | Technology knowledge share. |
Factory building advising. | |
Business expansion adbvising |
11.FAQ
MOQ |
1 set |
Supply Ability |
20 sets per Month |
Shipping port |
Qingdao port, Shandong, China |
Packing details |
Fumigation-free wooden case outside, stretch film inner |
Relevant spare parts |
free, delivery with processing line |
Guarantee |
Within 12 months |
Oversea service |
Provide installation and commissioning after machine arrived your factory |
Payment terms |
30% is paid by T/T as the down payment, 70% is paid by T/T orL/C before shipment. |
Delivery time |
30 days after receipt the deposit |
Pre-shipment |
When it finished, we will invite you to our company to inspect machines, when no problem, we will arrange the shipment |